Firewater Pond Lining: Pembrokeshire
15/06/2022
						Employer: AW Austel Ltd
Engineer: Whessoe-Volker Stevin
Location: Milford Haven, Pembrokeshire
Contract Size:
5,200m² 1.5mm Landflex PE150HD with Landflex G3000 protective geotextile
Purpose: Firewater pond lining for an oil terminal site
Contract Period: 1 Week